Catalog

CT-09

Field Log

Note site observations by trade, severity, and correction.

$540 / firm / year recommended. Next hooks: Drive · Teams · Outlook.

Open safety

1

Open notes

3

  • Header at exam 2 is 2 inches low of the dimensioned opening.

    2026-10-13 · Exam corridor · Framing · minor

  • Lead lining not installed. Waiting on CO-03.

    2026-10-13 · Imaging alcove · General · observe

  • Temporary panel cover missing at the south end.

    2026-10-10 · Electrical room · Electrical · safety