Newsroom · 13 October 2026
Eleven releases, with the links in the copy.
One release for Connect Ten and one for each tool. Each story links the product, the other tools on this desk, companies on arqs.ca, and offers that already have a store page. Recommended prices are unvalidated. These pages are the releases. They are not a post on West Coast News until that site carries them.
CT-00 · Connect Ten
ARQS opens Connect Ten, ten practice tools on one desk
Fee, permits, questions, changes, drawings, pursuits, minutes, specifications, field notes, and invoices. One firm license, still unvalidated.
CT-01 · FeeForge
ARQS introduces FeeForge for architecture fees
Construction cost, a base percent, complexity, and the phase split. The fee and each phase amount come back on the same screen.
CT-02 · PermitPath
ARQS introduces PermitPath for open permit items
One line per agency item, with status and a due date, and a count of what is still open.
CT-03 · RFI Desk
ARQS introduces RFI Desk for questions that have a clock
Number, parties, ball-in-court, and how many days the question has been open.
CT-04 · Change Desk
ARQS introduces Change Desk for cost and time
Proposed, approved, and rejected changes, with a running total that ignores the rejected lines.
CT-05 · Sheet Index
ARQS introduces Sheet Index, a drawing register
Discipline, number, title, revision, date, and whether the sheet is draft, issued, or superseded.
CT-06 · Client Pulse
ARQS introduces Client Pulse for proposals and next touches
A short pipeline: stage, expected fee, last touch, and the next action. Not a full CRM.
CT-07 · Minutes Rail
ARQS introduces Minutes Rail for owners and dates
Attendees, decisions, and action items with a done check. Saved per meeting.
CT-08 · Spec Shelf
ARQS introduces Spec Shelf for a project-manual outline
A CSI shelf. Check the sections this project will actually specify, then export the outline.
CT-09 · Field Log
ARQS introduces Field Log for open site observations
Location, trade, severity, and whether the note is corrected. Safety items stay visible.
CT-10 · Invoice Lane
ARQS introduces Invoice Lane for phase billing
Contract, phase share, percent complete, previously billed, and retainage. Then the amount due this period.